Maverick Applied Science

Strategies for Success: Field Installation Best Practices in FRP and Dual Laminate Piping

Maverick Applied Science
1 min read
Field Installation Best Practices in FRP and Dual Laminate Piping

This presentation, by Jeff Fraser and Jeff Graves of RPS Composites, provides a comprehensive overview of the essential steps for successful field installation of FRP and dual laminate piping systems, focusing on meeting operational life expectancy and minimizing risk.

Key installation best practices discussed include proper storage and handling, support placement and alignment, bolt torque sequencing for flanged connections, joint bonding and lamination techniques, and field quality control inspections.

By adhering to rigorous quality standards during site assembly and field bonding, plant owners can prevent premature joint leaks, mechanical strain, and unexpected failures in critical chemical process piping.

Article Author

Maverick Applied Science

Maverick Applied Science Engineering & Field Services

Related Articles

Plant Engineers Forum

Announcing our 2026 Forum Lineup

We are delighted to announce the finalized technical program and schedule for this year’s Plant Engineers Forum!

Read More
Plant Engineers Forum

Forum Registration Is Now OPEN!

It’s that time of year again – we are officially opening registration for Maverick’s 9th Annual Plant Engineers Forum for Nonmetallics, and 2026 is shaping up to be our biggest, most influential event yet...

Read More
Plant Engineers Forum

Ensuring ROI When Choosing Rotolining for Critical Process Equipment

Rotational lining as a form of corrosion protection to metal equipment is not a well-understood technology for many processors...

Read More

Need Expert FRP Engineering or Inspection Services?

Our team of certified engineers and nonmetallic inspectors can evaluate your process piping, dual laminate vessels, and chemical storage equipment.