Most project successes have not happened without effort and a comprehensive solution. In many cases where FRP applications have been problematic, it has been due to some oversight in the details of engineering, fabrication, or installation. Localized stresses are not always evident and may not be addressed by general design practices. In this presentation, Jeff Eisenman, President of Maverick Applied Science, will discuss situations where excessive or unaddressed localized loads have negatively impacted the performance and reliability of FRP systems. The purpose of this presentation is to bring some of these localized loads and stresses to light for discussion and future consideration. Root causes and potential remedies will be discussed.
Recent Posts
- Ensuring ROI When Choosing Rotolining for Critical Process Equipment
- FRP Piping Project Planning and Execution
- From a Developing Industry to Maturity –25 years with Maverick Applied Science, Inc.
- Case Studies for Sealing Non-Metallic Flanges
- FRP 101 – Fundamentals of FRP Materials and Construction Methods
Archives
- November 2024
- October 2024
- September 2024
- August 2024
- July 2024
- June 2024
- March 2024
- February 2024
- January 2024
- December 2023
- November 2023
- October 2023
- September 2023
- August 2023
- July 2023
- June 2023
- February 2023
- September 2022
- August 2022
- July 2022
- May 2022
- April 2022
- February 2022
- December 2021
- November 2021
- October 2021
- September 2021
- August 2021
- July 2021
- June 2021
- May 2021
- December 2020
- September 2020
- April 2020
- December 2017
- July 2017
- May 2017
- December 2016
- November 2016
- October 2016
- September 2016
- July 2016
- June 2015
- April 2015
- October 2014
- September 2014
- May 2014
Recent Comments